Evaluation of the public consultation on change to the Technical specification of the external interface ISOT and ISZO
OKTE, a.s. announces that from 04. 09. 2024 až 18. 09. 2024 a public consultation was held on change to the Technical specification of the external interface ISOT and ISZO.
One market participant participated in the public consultation, its comments together with OKTE, a.s. can be found in Slovak language HERE.
OKTE, a.s. at the same time report that the drafts of the Technical specification of the external interface ISOT and ISZO have been duly published HERE and HERE. This version of the technical specification is expected to enter into force on 18. 11. 2024.